|
|
|
Designing an
appropriate storm water management plan should start at the stream end with
an evaluation of existing steam conditions and an assessment of which BMPs
are best suited for site conditions.
|
|
|
|
If you are
considering putting in a detention basin and a wetland, is there enough room
for adequately-sized features?
|
|
|
|
An assessment of
downstream condition is also important.
Consider downstream land uses and look for potential problem areas
including undersized drainage culverts or extensive stream encroachments.
|