The lots have been altered from the community’s standard lot size to allow room for greenspace.  The development was designed to follow natural contours.  Detention basins (2) were located in natural swales.  (Note these are detention basins that are not meant to store water indefinitely as one would in a retention basin.)

You might want to flip back and forth between the last slide and this one to highlight the changes.